Friday, June 29, 2007

Mexicanas Follando Vedeos

insulation, stairs repaired (28/06/2007)

And again it's gone forward in Fehr: The floors are insulated, the broken staircase wall has been repaired professionally. In the future Cinema is the floor insulation is installed (one can only hope that the standing water before it is removed !!!). Next week, then, can the underlay to be cast.

also have been installed on the roof of the crossbar. Now there are missing only the brick ...













Monday, May 28, 2007

Antidepressants Trigger Mania Bipolar

Interior plumbing and heating (from finger house)

On 15 and 16 May the plumbing and heating engineers were on site.
The whole pre-installation for tub and shower, and made for the Ecktoillette.
The radiators were mounted. In the bathroom we have opted for a wall heater and floor heating also held (so that we have in winter, always warm feet).
Here are some photos:
The radiator in the nursery.
right, the wall is in the good luck charm is the image of our sponsored child Ysabel.






The heated bathroom floors.

shower and bathtub can be seen already.








Our kitchen with outlet and inlet.







Our unfinished floor in the hallway.








Tuesday, May 1, 2007

Soundsream Dvd Problems

Today is our big day!

On 24/04/2007 we went to go last. At 5.00 clock in the morning the alarm clock rang. Still totally sleepy we were on our way to our site. When we arrived there was already the crane. Just in time for six clock, as agreed, was the
column Piatek
(Top people. Better we could not have).
first finger truck stood with our apartment house behind it.
was lost no time and started to build. Morning at 10:00 the clock throughout the walls of the apartment had already been made. We came from the wonder not get out. It all happened very quickly.
were then even the parts for the attic to it.
the late afternoon, even the roof. At 21.00 clock was it a day.

The next morning at 8.00 she went on her clock. The roof was covered and secured the gutter. The balcony floor was finished.

On Thursday, the third and last day, everything was fixed and everything nailed. The electrician came home from finger and have completed the raw installation.


Now some Photos:

We have zwar weit über zweihundert Bilder gemacht, aber hier nur die wichtigsten.




Um 6.oo Uhr stellte der Kranfahrer seinen Kran auf.
In unserer Einfahrt der Materialwagen der Kolonne.










Ein Bild vom netten Kranfahrer.








6.30 Uhr
Die erste Wand schwebt in der Luft.








Und schon steht die erste Wand in unserer Wohnung











the nearest wall!







a bathroom wall.




















HWR The room is almost finished.









This is an exterior wall (bathroom and bedroom).









The Außenwand von Kinderzimmer und Schlafzimmer.







10.00 Uhr
Unser Balkon und die Leute vom Gerüstbau.








Das erste Deckenteil schwebt heran.











Und das letzte wird auch gesetzt.




Jetzt ist das Dach dran.
















Das first roof substructure part fits.














This was all made ready on the first day !!!!!








On the second day the roof was already covered!!







AND THE HOUSE IS FINISHED!!