Monday, May 28, 2007

Antidepressants Trigger Mania Bipolar

Interior plumbing and heating (from finger house)

On 15 and 16 May the plumbing and heating engineers were on site.
The whole pre-installation for tub and shower, and made for the Ecktoillette.
The radiators were mounted. In the bathroom we have opted for a wall heater and floor heating also held (so that we have in winter, always warm feet).
Here are some photos:
The radiator in the nursery.
right, the wall is in the good luck charm is the image of our sponsored child Ysabel.






The heated bathroom floors.

shower and bathtub can be seen already.








Our kitchen with outlet and inlet.







Our unfinished floor in the hallway.








0 comments:

Post a Comment