Pflasterarbeiten gestartet
We have a proper approach path for moving forward, was begun with the work outside. The entrance is almost complete including the carport foundations. In the coming days nor the way around the house and the entrance area will follow.
Monday, April 27, 2009
Tuesday, April 21, 2009
Phrases For Wedding Congratulations
HaHa. Träger!
Now that we (hopefully) turn inside the house on the home stretch, we'll get used to the exterior design. On Monday, the footings for the carport including H-beams and cast tomorrow to start preparations for the patch.
also take the dependencies again: spatulas - Bonding - painters - laminate lay - Install doors and stairs - Acceptance - Move ...
Now that we (hopefully) turn inside the house on the home stretch, we'll get used to the exterior design. On Monday, the footings for the carport including H-beams and cast tomorrow to start preparations for the patch.
also take the dependencies again: spatulas - Bonding - painters - laminate lay - Install doors and stairs - Acceptance - Move ...
Tuesday, April 14, 2009
Oovoo Doesnt Find The Camera
Dusche -1, Wanne +1
major battle again this morning was on our site. The tray in the bathroom was removed because it was installed wrong. As a result, the pretreatment of the tile substrate in the shower tray must be renewed. To balance the clients mind again but the tub was set. For this we had originally ordered a special polystyrene carrier. Due to the small hole in the floor and the amount of pipes in the floor area of the tank installation would be more of a modern carving at hand. Therefore we have chosen this position again.
addition, the solar panels on the roof connected. Also, the tile and the roofer and the shutters were Bauer sighted for reworking.
major battle again this morning was on our site. The tray in the bathroom was removed because it was installed wrong. As a result, the pretreatment of the tile substrate in the shower tray must be renewed. To balance the clients mind again but the tub was set. For this we had originally ordered a special polystyrene carrier. Due to the small hole in the floor and the amount of pipes in the floor area of the tank installation would be more of a modern carving at hand. Therefore we have chosen this position again.
addition, the solar panels on the roof connected. Also, the tile and the roofer and the shutters were Bauer sighted for reworking.