Dusche -1, Wanne +1
major battle again this morning was on our site. The tray in the bathroom was removed because it was installed wrong. As a result, the pretreatment of the tile substrate in the shower tray must be renewed. To balance the clients mind again but the tub was set. For this we had originally ordered a special polystyrene carrier. Due to the small hole in the floor and the amount of pipes in the floor area of the tank installation would be more of a modern carving at hand. Therefore we have chosen this position again.
addition, the solar panels on the roof connected. Also, the tile and the roofer and the shutters were Bauer sighted for reworking.
0 comments:
Post a Comment