Sunday, September 9, 2007

Suicide Facial Reconstruction For Funeral

final sprint (09.09.2007)

It continues with the final sprint in Fehren. The plumbing has already installed some of the bathroom fittings and furniture (mirror cabinet floor) - a toilet and a washstand had a shipping damage and must be replaced. The environment always looks more like garden (respectively for 'base to add get a garden "). The masonry increasingly takes its final shape - very nice.

This weekend we have again made a couple of crates to Fehren. Well, the move is getting closer and closer! Let's hope that by then everything will be done (at least the "vital" things).









Saturday, September 8, 2007

Can U Burn Your Esophagus

builders event of Renggli (06.09.2007)

On Thursday evening we have not let us take the offered Renggli of "gratitude" event to visit for all building owners in recent years. Place, the whole - how else could it be ;-) - in the scenic "rural" Luzernbiet near Sursee. More specifically in the "KKL Uffikon, where contemporary art of the allegedly known (we have this really not a reference!) Issued Lucerne artist Wetz and other artists. The leadership has even taken over artist Wetz. He is coming over more like a comedian, at best he would be very well suited as a motivational speaker. His stories and anecdotes were interesting, funny and entertaining. The subsequent food was very tasty: Grillade with a variation of flesh from Scottish Hochlandrind (Steak, Spiesschen, Wurst, Hamburger) aus biologischer Produktion und Salat. Zum Dessert sind Beeren offeriert worden.

Es war natürlich sehr nett, mit diversen Personen der Firma Renggli über unser aktuelles Projekt sprechen zu können. Unser Blog scheint in der ganzen Firma auf sehr viel Resonanz gestossen zu sein. Dieser wird angeblich von vielen Renggli-Mitarbeitern gelesen, bis hin zu Mitgliedern der Geschäftsleitung - das freut uns natürlich sehr. Auch gäbe es seither einen "Running Gag" bei den Projektleitern: Sie werden jetzt auch einen Blog eröffnen und jeweils Frust und Freude des Tages dokumentieren ;-)

Schön war sicherlich auch, wiedermal mit unserem Projektberater Thomas toast to Ernie. Unfortunately, our site manager Roland Bösch mouth was not at the event, with him we would like to drink a glass and thanked us for his good work. There are photos from our side can not - and we must now continue, "packing cases" with.

Wednesday, September 5, 2007

Wędrówki Po Florencji

balcony, garage door, plumbing (05/09/2007)

Finally I am also wiedermal to carry on our blog. Slowly but surely it is really the home stretch, not only on the site ... We have also transported over the weekend quite a few car loads to move material from Biel-Benken after Fehren. A basement room is pretty full.

also works on the construction site every day something (no, "something" is quite a Understatement, it is equipped with various artisan batches in parallel with the completion of construction). The following is a brief outline of what each day has been done with:

- Friday, 08.31. : granite worktops kitchen, parquet completion

- weekend : reins Charge 1, detailed planning grounds / masonry with a friend / landscape architect or garden designer Luzi

- Monday, 03.09. : Supply and installation of balcony (Looks great, but for the foundations has once again committed a mistake somewhere -> see image below), completion of the cooking assembly, meeting with Mr. Rölli masonry, waterproofing garage

- Tuesday, 09.04. : masonry, electrical installation, heating / ventilation installations

- Wednesday, 09.05. : garage door installation, ventilation, sanitary equipment start-installations, electricians

So it's really something going on up there! In two weeks, but must also be ready in all (at least inside, the environment can also take a bit longer). What will be my view, a large and expensive chunks is the construction cleaning - luckily we do not do this yourself! That would be a horror, a few craftsmen namely (unerfreulicherweise actually - but it hardens with time, from) true qualities as a "pig in . Universe "proven by the dirt at all possible and impossible places

The story with the false floor is also last up cooked again, I had to -. Let's say neutral - treading a little unconventional ways But we have assurances and deadlines. get for the action "sanding and oiling" of the parquet.