floor sanding & oiling / Delivery washing machine, dryer, freezer (24/09/2007)

Since today is the first day of my 4-week holiday is queued, I have now installed the supplied equipment (washing machine, Dryer and freezer attended). Seem to have great equipment, no wonder you are almost on the first use ;-)

addition of Renggli-floor service has done its first string: Loops and the first rites. It smelled very good after the oil and looks set to Floor think I also really great!








How Much Money Has Pinky Made?

final inspection will be open day and last work (22.09.2007)

shame on me, the frequency of blog entries has been greatly reduced lately .. . Not that too little would be gone - on the contrary! Because we are pretty busy with moving, building inspection and the open day has never passed me, unfortunately - or I was always too groggy to even what to write.

So now in order. Last week, yet the recent work such as silicone joints, remaining doors (Schreiner was really at the last minute at work), balcony rust, door locks and the like have been done. On Thursday, 20.09. it was a great day: Building cleaning and house purchase in the evening together with our construction manager. The cleaning has been done excellently (from ISS), the list of deficiencies remained in the normal range.
On Saturday was the second major Tag: "Open House" - first from the sale of the company Abeil Renggli and then by ourselves for neighbors, relatives and friends. Both parts were a resounding success and a truly great and wonderful experience. In the morning and early afternoon about 65 Renggli Organizers have come look at our house. I was there about two-thirds of the time. I was allowed to take a lot of very positive feedback to our house opposite - that I was very pleased!

went from 15.00 we continued with our aperitif in the house. In addition to our family, friends, colleagues and friends are stopping by and practically all invited (future) neighbors, and have often even with a gift surprised. These have been really pleased with all my heart that such a launch as a "stranger" in a new village is really quite wonderful. To all neighbors, read along here: THANK YOU VERY MUCH FOR THE NICE and warm welcome! The final score, then so about 21 o'clock to go back - and we are tired but happy and drove many impressions back to Biel-Benken.









Sunday, September 16, 2007

How Much Does It Cost To Fill A Filling

Another (Civil) Week ... (16/09/2007)

is Another eventful week is over. Various artisan batches have completed their work. Thus the environment of the granite wall, rough grading and Kieskofferung has been successfully implemented (thank you, Mr. Rolli!). We also have water and electricity and plumbing fixtures are all installed. The plate layer has completed its work and (he had to do on Saturday once again antanzen to repair) and the wallpaper has also been corrected.

We have confined themselves to us not only to further rein-boxes estates, but also with "sorrow and distress" mounted the hood in the kitchen. This has required several hours (and several attempts) and was pretty exhausting. Also most of our stainless steel bathroom accessories we have purchased in Hornbach.

Next week then grooved, are painted repaired and cleaned. On Thursday evening, is against the house decline, and on Saturday, the first company Renggli "open door" and then we with our friends and relatives.









Sunday, September 9, 2007

Suicide Facial Reconstruction For Funeral

final sprint (09.09.2007)

It continues with the final sprint in Fehren. The plumbing has already installed some of the bathroom fittings and furniture (mirror cabinet floor) - a toilet and a washstand had a shipping damage and must be replaced. The environment always looks more like garden (respectively for 'base to add get a garden "). The masonry increasingly takes its final shape - very nice.

This weekend we have again made a couple of crates to Fehren. Well, the move is getting closer and closer! Let's hope that by then everything will be done (at least the "vital" things).









Saturday, September 8, 2007

Can U Burn Your Esophagus

builders event of Renggli (06.09.2007)

On Thursday evening we have not let us take the offered Renggli of "gratitude" event to visit for all building owners in recent years. Place, the whole - how else could it be ;-) - in the scenic "rural" Luzernbiet near Sursee. More specifically in the "KKL Uffikon, where contemporary art of the allegedly known (we have this really not a reference!) Issued Lucerne artist Wetz and other artists. The leadership has even taken over artist Wetz. He is coming over more like a comedian, at best he would be very well suited as a motivational speaker. His stories and anecdotes were interesting, funny and entertaining. The subsequent food was very tasty: Grillade with a variation of flesh from Scottish Hochlandrind (Steak, Spiesschen, Wurst, Hamburger) aus biologischer Produktion und Salat. Zum Dessert sind Beeren offeriert worden.

Es war natürlich sehr nett, mit diversen Personen der Firma Renggli über unser aktuelles Projekt sprechen zu können. Unser Blog scheint in der ganzen Firma auf sehr viel Resonanz gestossen zu sein. Dieser wird angeblich von vielen Renggli-Mitarbeitern gelesen, bis hin zu Mitgliedern der Geschäftsleitung - das freut uns natürlich sehr. Auch gäbe es seither einen "Running Gag" bei den Projektleitern: Sie werden jetzt auch einen Blog eröffnen und jeweils Frust und Freude des Tages dokumentieren ;-)

Schön war sicherlich auch, wiedermal mit unserem Projektberater Thomas toast to Ernie. Unfortunately, our site manager Roland Bösch mouth was not at the event, with him we would like to drink a glass and thanked us for his good work. There are photos from our side can not - and we must now continue, "packing cases" with.

Wednesday, September 5, 2007

Wędrówki Po Florencji

balcony, garage door, plumbing (05/09/2007)

Finally I am also wiedermal to carry on our blog. Slowly but surely it is really the home stretch, not only on the site ... We have also transported over the weekend quite a few car loads to move material from Biel-Benken after Fehren. A basement room is pretty full.

also works on the construction site every day something (no, "something" is quite a Understatement, it is equipped with various artisan batches in parallel with the completion of construction). The following is a brief outline of what each day has been done with:

- Friday, 08.31. : granite worktops kitchen, parquet completion

- weekend : reins Charge 1, detailed planning grounds / masonry with a friend / landscape architect or garden designer Luzi

- Monday, 03.09. : Supply and installation of balcony (Looks great, but for the foundations has once again committed a mistake somewhere -> see image below), completion of the cooking assembly, meeting with Mr. Rölli masonry, waterproofing garage

- Tuesday, 09.04. : masonry, electrical installation, heating / ventilation installations

- Wednesday, 09.05. : garage door installation, ventilation, sanitary equipment start-installations, electricians

So it's really something going on up there! In two weeks, but must also be ready in all (at least inside, the environment can also take a bit longer). What will be my view, a large and expensive chunks is the construction cleaning - luckily we do not do this yourself! That would be a horror, a few craftsmen namely (unerfreulicherweise actually - but it hardens with time, from) true qualities as a "pig in . Universe "proven by the dirt at all possible and impossible places

The story with the false floor is also last up cooked again, I had to -. Let's say neutral - treading a little unconventional ways But we have assurances and deadlines. get for the action "sanding and oiling" of the parquet.