Finally it's off to a long waiting ahead on the construction site. We have to extended meeting concluded with the plate layer and the installation methods in EC (Jaddish slate), bath (black pottery and river pebbles) and WC (black ceramic mosaic and longitudinal) are discussed. This is very noble! Unfortunately, the underlay is too wet to get started. must now be hurried along with hot air. Next week should be loose-but definitely.
Area (Kanlisation, connections, shafts and granite wall) also starts next week ... Finally it runs smoothly again. And there's are about seven weeks until the river end of September.