Friday, August 31, 2007

Ipod Radio With Nature Sounds

kitchen, parquet, doors, wall (30/08/2007)

As of Wednesday and Thursday to the site went back extremely something. That has to eventually be the case, because on Saturday in three weeks is to take place so the Renggli Verkausevent (and in four weeks of collection).

on Thursday was why our very great joy when we saw that the kitchen was already made at least in part, that it is already mounted a couple of doors and the upstairs floor has been laid for more than half. Also Mr. Rölli of the company has Affentranger continued working on the "work of art granite wall." He coated the thing ashlar very accurate and visually appealing.

On Thursday evening, arrived back home in Biel-Benken, we studied the floor model (which we took to cabinet-Searching-for purposes of the construction site). The shock was great, the disappointment even greater! The false floor has been shifted: instead of Beech / Beech oiled / sealed. Och du steaming crap! In addition, it has been found that our former election was never recorded clearly. After reporting to Roland (our supervisor), the world - for us at least - glücklichwerweise again looked better. The "debt" is Renggli, the correction is at the expense Renggli. So we will probably leave the floor sanding and hand oils. Here's how it is desired optically.




Sunday, August 26, 2007

Period Due Yesterday Negative

Yankee in Fehren (25/08/2007)

Since the move-in date is scheduled in a month, worked in Fehren full throttle on the timely completion of our house. The plate layer is ready to 80%, the final finish can be made after the use of the electrician and plumber.

The environment also takes more shape, Geländeaufschüttungen are made in large part, the connections too (finally, finally ...). This week, with the granite wall (but not Calanca but Maggia-granite) on thursday already begun and the kitchen should be insatlliert. Likewise, we are waiting (still) on the Supply and installation of the doors.

A couple of small annoyances, of course, always connect at times. If they are not resolved immediately (can), I will stop at the final acceptance test in accordance with "picky" and demand the removal of defects. Overall, the problems are manageable and the joy is soon ready for the house to an x-fold greater.









Tuesday, August 21, 2007

Public Transit From Anthem

Plasterers, builders (21/08/2007)

The plate layer has been busy and today has the ground floor has a large area of the Jaddish Slate down. Looks sensational!
also the builder has worked in recent days, the connections are made and installed the sewer manholes. There really is something.
Big day of 03.09. be as balcony and the kitchen will be installed. Moving in, you can come! ;-)







Tuesday, August 14, 2007

Icing That Dogs Can Eat

return builder - Drainage (14.08.2007)

The builder is (finally) returned to Fehren to close to sewers and other conduits and the granite block retaining walls to plus create the terrain to model ready. The execution the masonry we have discussed with the architect-people in detail.

The interior of the painter has been fairly gas, blankets and Scandatex wallpapers are already in the advanced stadium. The rooms appear in the sunlight glistening bright, but overall it works very good and noble! Also, the plate layer has continued his work in the upper bathroom. As one can very forward to it!







Sunday, August 12, 2007

What Parmesan Cheese Do They Use At Eastsides

It runs again what - painters, plasterers (12/08/2007)

finally you go back around on the site. The painter is because the white plaster ceiling and Holz-/MDF-Elemente white (RAL 9016) to delete. The plate layer is skillful in the EC-WC, plätteln to the wall with the longitudinal mosaic. Looks great!

From tomorrow then back to the builder (Affentranger) become active and create drainage, grading and granite wall. The course we're happy - especially after a nearly three-week holiday period, have been made in almost nothing.







Wednesday, August 8, 2007

Hypothyroidism,breast Rash

appointment with Paver (08/08/2007)

Finally it's off to a long waiting ahead on the construction site. We have to extended meeting concluded with the plate layer and the installation methods in EC (Jaddish slate), bath (black pottery and river pebbles) and WC (black ceramic mosaic and longitudinal) are discussed. This is very noble! Unfortunately, the underlay is too wet to get started. must now be hurried along with hot air. Next week should be loose-but definitely.

Area (Kanlisation, connections, shafts and granite wall) also starts next week ... Finally it runs smoothly again. And there's are about seven weeks until the river end of September.







Wednesday, August 1, 2007

Mount And Blade Hair Styles

Boring, boring - Bauferien (01.08. 2007)

For more than a week on the site is nothing more. This really is a total boring situation. By no later than next week but need a few courses are risen ...

The construction manager and the workmen are in the (construction) holiday. With the expansion of attachments, we are still in the plan: The plasterer has finished his work and the heat pump is installed Soviets, now we have only to eventually power. The environment is probably the end of September but not completely finished. I hope that there is to report the good news next time!