Sunday, December 9, 2007

Oil Free Laura Mercier Non Comedogenic

settled in the new house (09.12. 2007)

Embarrassing, embarrassing, and shame on me . Since the introduction I have the time for the blog is no longer taken. It's a shame, at this time but went very much ...

I try and give a brief overview of the events since the last entry:

* 24.09. to 27.09. is devoted to the preparation for moving day on Friday 28.09. stood. Packing in Biel-Benken the goods and perform in the last Fehren own work (For example, waterproof slate) and it always good to move a couple of little boxes.

* 28.09. Moving day (or rather half-day) with the Siegel firm in Basel. The boys have worked quickly and with virtually no damage. Stressfreiste was our day in the week. The first Night was for blessing me with little sleep (nervousness as the newly appointed master of the house), Miriam has made good for their sleepless nights last week.

* 29.09. to 02.10. Cleaning marathon in Biel-Benken. Was exhausting and not very satisfactory (one wants to set up the new house ...) and have been properly effort. Thank you to my sister Corinne and Miri's parents for the plaster support!

* In the remaining weeks of vacation, of Miriam and me (. To 21.10), we are driven x-times in DIY (OBI, Coop ,...) and furniture stores (IKEA, Pfister, Interio, M-cocked hat) to us with the necessary things for the new house . Stock up We have also started to paint the basement and move the white in the OBI purchased Parador laminate (walnut-look). It simply needs the most ever more time than you plan in advance through. The cellar is on the right track ...

* On Friday, 05.10. We got our furnace yet delivered and installed. A great part, which fits very well into the house and meet the little pyromaniac in us can. Great investment!

* Since we are working again, we got more and more of a live - and work in and around the house to lie more often .... Where do they deal not so much time and energy (after work) to work with Keller.

Overall we are very pleased and proud with our beautiful house. It was worth it and result in an overall better quality of life greatly. The warranty work due to the decrease are progressing though, had all but certainly a whole lot can go ahead expeditiously (For example, it is the painter has not been here and the final settlement with Renggli has still not). This bothers us, but really not too much, because it first must be made either way and because we are second, the last payment to Renggli not long released until the pending items list is not processed.

We have already had a first case for building insurance: The storm last weekend of a chimney has "adopted" and was carried away by the wind - fortunately only on the empty sheep grazing next door.

So, for illustration's again a few photos:


Monday, September 24, 2007

Guys Strangling His Balls

floor sanding & oiling / Delivery washing machine, dryer, freezer (24/09/2007)

Since today is the first day of my 4-week holiday is queued, I have now installed the supplied equipment (washing machine, Dryer and freezer attended). Seem to have great equipment, no wonder you are almost on the first use ;-)

addition of Renggli-floor service has done its first string: Loops and the first rites. It smelled very good after the oil and looks set to Floor think I also really great!








How Much Money Has Pinky Made?

final inspection will be open day and last work (22.09.2007)

shame on me, the frequency of blog entries has been greatly reduced lately .. . Not that too little would be gone - on the contrary! Because we are pretty busy with moving, building inspection and the open day has never passed me, unfortunately - or I was always too groggy to even what to write.

So now in order. Last week, yet the recent work such as silicone joints, remaining doors (Schreiner was really at the last minute at work), balcony rust, door locks and the like have been done. On Thursday, 20.09. it was a great day: Building cleaning and house purchase in the evening together with our construction manager. The cleaning has been done excellently (from ISS), the list of deficiencies remained in the normal range.
On Saturday was the second major Tag: "Open House" - first from the sale of the company Abeil Renggli and then by ourselves for neighbors, relatives and friends. Both parts were a resounding success and a truly great and wonderful experience. In the morning and early afternoon about 65 Renggli Organizers have come look at our house. I was there about two-thirds of the time. I was allowed to take a lot of very positive feedback to our house opposite - that I was very pleased!

went from 15.00 we continued with our aperitif in the house. In addition to our family, friends, colleagues and friends are stopping by and practically all invited (future) neighbors, and have often even with a gift surprised. These have been really pleased with all my heart that such a launch as a "stranger" in a new village is really quite wonderful. To all neighbors, read along here: THANK YOU VERY MUCH FOR THE NICE and warm welcome! The final score, then so about 21 o'clock to go back - and we are tired but happy and drove many impressions back to Biel-Benken.









Sunday, September 16, 2007

How Much Does It Cost To Fill A Filling

Another (Civil) Week ... (16/09/2007)

is Another eventful week is over. Various artisan batches have completed their work. Thus the environment of the granite wall, rough grading and Kieskofferung has been successfully implemented (thank you, Mr. Rolli!). We also have water and electricity and plumbing fixtures are all installed. The plate layer has completed its work and (he had to do on Saturday once again antanzen to repair) and the wallpaper has also been corrected.

We have confined themselves to us not only to further rein-boxes estates, but also with "sorrow and distress" mounted the hood in the kitchen. This has required several hours (and several attempts) and was pretty exhausting. Also most of our stainless steel bathroom accessories we have purchased in Hornbach.

Next week then grooved, are painted repaired and cleaned. On Thursday evening, is against the house decline, and on Saturday, the first company Renggli "open door" and then we with our friends and relatives.









Sunday, September 9, 2007

Suicide Facial Reconstruction For Funeral

final sprint (09.09.2007)

It continues with the final sprint in Fehren. The plumbing has already installed some of the bathroom fittings and furniture (mirror cabinet floor) - a toilet and a washstand had a shipping damage and must be replaced. The environment always looks more like garden (respectively for 'base to add get a garden "). The masonry increasingly takes its final shape - very nice.

This weekend we have again made a couple of crates to Fehren. Well, the move is getting closer and closer! Let's hope that by then everything will be done (at least the "vital" things).









Saturday, September 8, 2007

Can U Burn Your Esophagus

builders event of Renggli (06.09.2007)

On Thursday evening we have not let us take the offered Renggli of "gratitude" event to visit for all building owners in recent years. Place, the whole - how else could it be ;-) - in the scenic "rural" Luzernbiet near Sursee. More specifically in the "KKL Uffikon, where contemporary art of the allegedly known (we have this really not a reference!) Issued Lucerne artist Wetz and other artists. The leadership has even taken over artist Wetz. He is coming over more like a comedian, at best he would be very well suited as a motivational speaker. His stories and anecdotes were interesting, funny and entertaining. The subsequent food was very tasty: Grillade with a variation of flesh from Scottish Hochlandrind (Steak, Spiesschen, Wurst, Hamburger) aus biologischer Produktion und Salat. Zum Dessert sind Beeren offeriert worden.

Es war natürlich sehr nett, mit diversen Personen der Firma Renggli über unser aktuelles Projekt sprechen zu können. Unser Blog scheint in der ganzen Firma auf sehr viel Resonanz gestossen zu sein. Dieser wird angeblich von vielen Renggli-Mitarbeitern gelesen, bis hin zu Mitgliedern der Geschäftsleitung - das freut uns natürlich sehr. Auch gäbe es seither einen "Running Gag" bei den Projektleitern: Sie werden jetzt auch einen Blog eröffnen und jeweils Frust und Freude des Tages dokumentieren ;-)

Schön war sicherlich auch, wiedermal mit unserem Projektberater Thomas toast to Ernie. Unfortunately, our site manager Roland Bösch mouth was not at the event, with him we would like to drink a glass and thanked us for his good work. There are photos from our side can not - and we must now continue, "packing cases" with.

Wednesday, September 5, 2007

Wędrówki Po Florencji

balcony, garage door, plumbing (05/09/2007)

Finally I am also wiedermal to carry on our blog. Slowly but surely it is really the home stretch, not only on the site ... We have also transported over the weekend quite a few car loads to move material from Biel-Benken after Fehren. A basement room is pretty full.

also works on the construction site every day something (no, "something" is quite a Understatement, it is equipped with various artisan batches in parallel with the completion of construction). The following is a brief outline of what each day has been done with:

- Friday, 08.31. : granite worktops kitchen, parquet completion

- weekend : reins Charge 1, detailed planning grounds / masonry with a friend / landscape architect or garden designer Luzi

- Monday, 03.09. : Supply and installation of balcony (Looks great, but for the foundations has once again committed a mistake somewhere -> see image below), completion of the cooking assembly, meeting with Mr. Rölli masonry, waterproofing garage

- Tuesday, 09.04. : masonry, electrical installation, heating / ventilation installations

- Wednesday, 09.05. : garage door installation, ventilation, sanitary equipment start-installations, electricians

So it's really something going on up there! In two weeks, but must also be ready in all (at least inside, the environment can also take a bit longer). What will be my view, a large and expensive chunks is the construction cleaning - luckily we do not do this yourself! That would be a horror, a few craftsmen namely (unerfreulicherweise actually - but it hardens with time, from) true qualities as a "pig in . Universe "proven by the dirt at all possible and impossible places

The story with the false floor is also last up cooked again, I had to -. Let's say neutral - treading a little unconventional ways But we have assurances and deadlines. get for the action "sanding and oiling" of the parquet.

Friday, August 31, 2007

Ipod Radio With Nature Sounds

kitchen, parquet, doors, wall (30/08/2007)

As of Wednesday and Thursday to the site went back extremely something. That has to eventually be the case, because on Saturday in three weeks is to take place so the Renggli Verkausevent (and in four weeks of collection).

on Thursday was why our very great joy when we saw that the kitchen was already made at least in part, that it is already mounted a couple of doors and the upstairs floor has been laid for more than half. Also Mr. Rölli of the company has Affentranger continued working on the "work of art granite wall." He coated the thing ashlar very accurate and visually appealing.

On Thursday evening, arrived back home in Biel-Benken, we studied the floor model (which we took to cabinet-Searching-for purposes of the construction site). The shock was great, the disappointment even greater! The false floor has been shifted: instead of Beech / Beech oiled / sealed. Och du steaming crap! In addition, it has been found that our former election was never recorded clearly. After reporting to Roland (our supervisor), the world - for us at least - glücklichwerweise again looked better. The "debt" is Renggli, the correction is at the expense Renggli. So we will probably leave the floor sanding and hand oils. Here's how it is desired optically.




Sunday, August 26, 2007

Period Due Yesterday Negative

Yankee in Fehren (25/08/2007)

Since the move-in date is scheduled in a month, worked in Fehren full throttle on the timely completion of our house. The plate layer is ready to 80%, the final finish can be made after the use of the electrician and plumber.

The environment also takes more shape, Geländeaufschüttungen are made in large part, the connections too (finally, finally ...). This week, with the granite wall (but not Calanca but Maggia-granite) on thursday already begun and the kitchen should be insatlliert. Likewise, we are waiting (still) on the Supply and installation of the doors.

A couple of small annoyances, of course, always connect at times. If they are not resolved immediately (can), I will stop at the final acceptance test in accordance with "picky" and demand the removal of defects. Overall, the problems are manageable and the joy is soon ready for the house to an x-fold greater.