Wednesday, July 4, 2007

Palpitations After An Anesthetic

covered roof, underlay cast (04.07.2007) EC

Today, Miriam and I together the site down to admire the progress of work. Anyway, we have been in the picture that the underlay yesterday poured and the roof with the brick has been snowed under.

On arrival at the house it's just me become a little uncomfortable because I meant to spot dark brown brick on our house. That should not even be true! But on closer inspection via scaffold has been found that it is the dark-gray clay antrazithfarbenen - as it was then chosen by us. But they have in real life a slightly brownish touch what I have to get used yet. (But now like all the pictures I've improved a lot ...)

is indoor tour Sorry, no location in it, because the ground / floor to dry up tomorrow, Thursday evening, before someone is allowed rumspazieren it. So we have only a small glimpse of the basement stairs ventured into the EC.









Tuesday, July 3, 2007

What Parmesan Cheese Do They Use At East Sides

wall, floor heating (29.06. / 02.07.2007)

The dividing wall in the living room has now also installed (see first image from 29.06.) On Monday, 02.07. Airbags are also all the underfloor heating installed. Underlay -. Can you come now (should be today, 03.07 happens to be ...).









Friday, June 29, 2007

Mexicanas Follando Vedeos

insulation, stairs repaired (28/06/2007)

And again it's gone forward in Fehr: The floors are insulated, the broken staircase wall has been repaired professionally. In the future Cinema is the floor insulation is installed (one can only hope that the standing water before it is removed !!!). Next week, then, can the underlay to be cast.

also have been installed on the roof of the crossbar. Now there are missing only the brick ...