Tuesday, July 24, 2007

Does Every Driver Need Insurance Ontario

Plasterer / heat pump installation (21.07.2007)

This past Saturday we once again lost to the construction site. It goes forward, but really containing much slower than the beginning. On the other hand, there is fortunately a way that the house be ready in two months!

The plasterer has continued to work (when the times are ready !?!), also been the floor-level shower parts installed in the ground - missing there "only" the bottom plates.
has also started the heating man trying to install the heat pump and boiler. An initial start-up can happen but probably until mid-August when the connections for power, etc. are made. Also announced is still waiting.

What worries us a little prepared, which is still (or again?) Moisture present in the basement. We have to watch very closely and if it is in a few weeks will not improve, we must act ...









Wednesday, July 18, 2007

Corporate 25th Anniversary

Plasterers (17.07.2007)

The cast is in action, leaving much plaster on ceilings, walls and on the - fortunately covered - ground.







Saturday, July 14, 2007

Cant See Files On Vuze

frame dismantled (14.07.2007)

After beginning this week in the - unfortunately rainy - vacation was, we are the first time on Wednesday evening was at the construction site . The three days from Monday to Wednesday is not really seen anything running (except that the carpenter has close down the wall between the kitchen and Redoubt). So the frustration was also felt a little bit.

Today we went in the morning to the site. The scaffolders were currently working to dismantle the scaffolding - on Saturday morning! This means, therefore, that the painter has done his job (which is also visible), and thus the external work on the house finished so far. Looks great from the house without scaffolding!

Inside, the plaster has (?) His work not yet accomplished over. The ceiling upstairs is completely enclosed with drywall and the EC about a third of the ceiling covered. Also, have a few joints with gypsum ausgepflatscht. Also installed is still the front door was, the color does not even ...

What has been less reason for celebration is the work compiled by our waste mountain. That we have deposited in the garage, and hope for early disposal. We have decided for the clearing operations before the stuff is buried in the ground. What is to say: There are already some "Pig" on such a site.

end of this week, we at last definitely decided on the materialization of the ambient wall works: instead of the preferred long Jurakalkblöcken we chose granite blocks from the Calancatal decided. The color and better frost resistance has ultimately made the difference. The walls should be added in August.









Saturday, July 7, 2007

In Wireless Quest Whatis The Locker Compination

underlay (06/07/2007)

Here are some impressions of the underlay, taken on the evening of 06/07/2007









Wednesday, July 4, 2007

Palpitations After An Anesthetic

covered roof, underlay cast (04.07.2007) EC

Today, Miriam and I together the site down to admire the progress of work. Anyway, we have been in the picture that the underlay yesterday poured and the roof with the brick has been snowed under.

On arrival at the house it's just me become a little uncomfortable because I meant to spot dark brown brick on our house. That should not even be true! But on closer inspection via scaffold has been found that it is the dark-gray clay antrazithfarbenen - as it was then chosen by us. But they have in real life a slightly brownish touch what I have to get used yet. (But now like all the pictures I've improved a lot ...)

is indoor tour Sorry, no location in it, because the ground / floor to dry up tomorrow, Thursday evening, before someone is allowed rumspazieren it. So we have only a small glimpse of the basement stairs ventured into the EC.









Tuesday, July 3, 2007

What Parmesan Cheese Do They Use At East Sides

wall, floor heating (29.06. / 02.07.2007)

The dividing wall in the living room has now also installed (see first image from 29.06.) On Monday, 02.07. Airbags are also all the underfloor heating installed. Underlay -. Can you come now (should be today, 03.07 happens to be ...).